Preparation of design and cost estimate documents for the improvement of the drinking water supply system of Kaghnut settlement of Kapan community, Syunik marz, RA
Within the framework of the project, dismantling of the existing catchment, and construction of a new drainage catchment, construction of a pumping station (water intake chamber) with horizontal installation of brand pumps, construction of a 762.0m long polyethylene water main, a 100m3 DRR, as well as a lightweight chlorination plant building with chlorination equipment operating with hypochlorite powder was designed.
The detailed design also envisaged construction of distribution water lines pipes with a length of about 3.4 km, a total of 7 rectangular and round r/c chambers for regulating, valve and fire hydrant units, and 50 individual house inlet lines, including the installation of water metering chambers.
Within the framework of the project, construction of a solar photovoltaic plant with an installed capacity of 40 KW was also planned to compensate the power consumption of the designed pumping station.