Improvement of the water supply network in the Nubarashen administrative district of Yerevan
Project Details
Within the framework of the project, works aimed at the reconstruction and zoning of the water supply distribution network of the Nubarashen district of Yerevan were planned. The district was conditionally divided into four zones, in which the following was generally planned:
- construction of water lines of the distribution network with a length of about 34.0 km,
- construction of a total of 140 rectangular and round concrete chambers,
- replacement of 1657 inlet lines of public buildings and private houses of the district with pipes with a length of about 12.5 km, installation of polymer sand and concrete water meter chambers,
- replacement of inlet lines of 36 apartment buildings of the district with a length of about 1.3 km,
- a pumping station with 3 pumps, each with a flow rate of 5.0 l/s, was also designed in zone I.