Technical supervision services of Tatev HPP DRR repair works
Project Details
The project included technical supervision of the construction of a 100,000 cub․m daily regulation pond, an approach canal, a pressure basin, an irrigation canal intake valve, as well as the installation of measuring and monitoring equipment of Tatev HPP, during which the following functions were performed:
- Ensuring strict compliance with design solutions and requirements
- Measurement of construction works and calculation of quantities
- Quality supervision of the application of a protective polyurethane coating over an area of 15,850 sq.m, and of 736 cub.m of reinforced-concrete works
- Identification of issues arising on construction sites, discussion with the Client, and presentation of possible solutions
- Monitoring and ensuring implementation of the construction work schedule and the contractor’s financing schedule
- Ensuring environmental protection and occupational health and safety throughout the entire construction process.