Development of design and cost-estimate documents for the construction of a drinking water headwork (river water intake) and treatment plant, as well as dismantling and reconstruction of the existing sand treatment plant in Baghanis settlement, RA Tavush region
Project Details
Within the framework of the project, the following design works were carried out in the Baghanis settlement:
- Design of a river water intake structure,
- Reconstruction of the existing water intake clarifier, including the provision of a new drainage pipe system and filter load, fencing of the sanitary protection zone. Provision of gabion retaining wall for the safety of the clarifier and improvement of the area.
- Construction of a water treatment plant building. Design of a complex of treatment equipment operating at the plant using “Cembrane” technology with a capacity of 260m3/day, design of an automatic control system for the plant’s operation and internal and external power supply systems. Design of external and internal water supply and drainage systems for the water treatment plant, improvement of the area.