The project included the design of a drinking water treatment plant for the Tsav settlement, including:

  • Design of the treatment plant's water supply and treated water removal pipelines and other intra-territorial infrastructure,
  • Design of the drinking water treatment plant building.
  • Design of a treatment plant complex operating with “Cembrane” membrane technology with a productivity of 260 m³/day.
  • Design of chemicals section and chlorination equipment.
  • Design of the automatic control system for the plant operation, as well as internal and external power supply systems.
  • Design of a metal fence with a total length of 60 m of the sanitary protection zone of the treatment plant, as well as landscaping works.
  • Design of a 60m long gabion retaining wall to protect the building from river floods.

Project Data

Funding Institution
RA State Budget
Client
Kapan Municipality
Co-Executors
--
Country
Armenia
Date
May 2025 – November 2025
Service
Preliminary and Detailed Design Development