Preparation of design and estimate documents for the construction of a drinking water treatment plant in the village of Tsav
Project Details
The project included the design of a drinking water treatment plant for the Tsav settlement, including:
- Design of the treatment plant's water supply and treated water removal pipelines and other intra-territorial infrastructure,
- Design of the drinking water treatment plant building.
- Design of a treatment plant complex operating with “Cembrane” membrane technology with a productivity of 260 m³/day.
- Design of chemicals section and chlorination equipment.
- Design of the automatic control system for the plant operation, as well as internal and external power supply systems.
- Design of a metal fence with a total length of 60 m of the sanitary protection zone of the treatment plant, as well as landscaping works.
- Design of a 60m long gabion retaining wall to protect the building from river floods.