Construction of the second phase of the drinking water supply system in the Lernanist settlement of the Hrazdan community of the RA Kotayk region
Project Details
A detailed design for improving the drinking water supply system of the Lernanist settlement was developed, within the framework of which the following was planned:
- Design of a superstructure building with 2.5 m high tuff stone masonry,
- Renovation of the existing 530.0m2 DRR.
- Design of a r/c dry cell.
- Design of a chlorine station building with installation of chlorination equipment operating with calcium hypochloride (powder), planning of external and internal power supply systems.
- Design of a metal fence with a total length of 40.0 m for the sanitary protection zone of the DRR, as well as area improvement.
- Design of r/c air vent and outlet chambers in the existing distribution network, Design of a distribution network with a length of 959.0m from polyethylene pipes with diameters of 32–75mm, with pressure regulating, valve and fire hydrant r/c chambers.
- Design of 695 individual house inlet lines and water meter units.