Project Details

Construction of the second phase of the drinking water supply system in the Lernanist settlement of the Hrazdan community of the RA Kotayk region

Construction of the second phase of the drinking water supply system in the Lernanist settlement of the Hrazdan community of the RA Kotayk region




Project Details

A detailed design for improving the drinking water supply system of the Lernanist settlement was developed, within the framework of which the following was planned:

  • Design of a superstructure building with 2.5 m high tuff stone masonry,
  • Renovation of the existing 530.0m2 DRR.
  • Design of a r/c dry cell.
  • Design of a chlorine station building with installation of chlorination equipment operating with calcium hypochloride (powder), planning of external and internal power supply systems.
  • Design of a metal fence with a total length of 40.0 m for the sanitary protection zone of the DRR, as well as area improvement.
  • Design of r/c air vent and outlet chambers in the existing distribution network, Design of a distribution network with a length of 959.0m from polyethylene pipes with diameters of 32–75mm, with pressure regulating, valve and fire hydrant r/c chambers.
  • Design of 695 individual house inlet lines and water meter units.

Project Data

Funding Institution
RA State Budget
Client
Hrazdan Municipality
Co-Executors
--
Country
Armenia
Date
October 2025 – November 2025
Service
Preliminary and Detailed Design Development
More Information
Back to Projects